2001Established
24+Years Experience
1Complete Package
AS 2159Compliant

CONTIGUOUS PILING

The standard Melbourne basement retention method. A row of closely-spaced bored piles forms a near-continuous earth retention wall — installed before excavation begins so every stage of digging is protected. ASAP Piling installs contiguous pile walls for residential and commercial basements across Melbourne.

CAPPING BEAMS

A reinforced concrete capping beam along the top of the pile row connects every pile head into a single structural element. It distributes lateral earth pressure uniformly, provides the connection point for basement slabs and anchor systems, and gives the retention wall its integrated structural behaviour. AS 3600-2018 compliant.

SHEET PILING

For sites requiring watertight retention or high groundwater exclusion, ASAP Piling installs interlocking steel sheet pile walls. Vibratory and press-in (silent) installation methods are available. Sheet piling is commonly specified for inner-city basements, below-water-table excavations, and waterfront structures across Melbourne and Victoria.

EXCAVATION

Once the retention wall is complete and the capping beam has cured, ASAP Piling excavates the basement void in a safe, staged sequence inside the protected perimeter. Delivering retention and excavation through one contractor eliminates the programme risk of trade interfaces at the most critical stage of construction.

ASAP Piling delivers the complete below-ground package for basement construction in Melbourne — contiguous pile wall installation, capping beam, and excavation under one roof. Working with one contractor for the full sequence means faster scheduling, clearer accountability, and no gaps between trades at the most critical stage of your project.

The Complete Basement Package

Melbourne basement construction involves three sequential stages below ground. ASAP Piling delivers all three:

1

Stage 1 — Pile Wall: A contiguous pile wall is installed around the basement perimeter before any excavation begins. This holds the surrounding ground in place throughout the dig.

2

Stage 2 — Capping Beam: A reinforced concrete beam is cast across the top of all pile heads to tie the wall together as a single structural unit.

3

Stage 3 — Excavation: The basement void is excavated in stages inside the completed wall, with temporary support installed at the depths specified by the engineer.

Why Use One Contractor?

Single ContractOne point of contact from start to handover — no disputes between trades
Faster ProgrammeNo mobilisation gap between piling and excavation — the same crew moves straight into the dig
No SurprisesThe team that installed the wall knows the ground conditions, levels, and any site-specific issues
Clear AccountabilityOne contractor is responsible for the entire below-ground package

What You Need to Get a Quote

Geotechnical Soil Report from a registered geotechnical engineer

Structural Engineer's Footing Drawings and Pile Schedule

Site Address and Access Description

Project Programme if available — helps with scheduling

Don't have a soil report yet? Call Nick and he can refer you to geotechnical engineers for your area. Written quotation within 2 to 3 business days of receiving complete documents.

Standards & Compliance

AS 2159-2009 — Piling: Design and Installation

All contiguous pile walls, bored pier foundations, and CFA pile installations comply with AS 2159-2009. Pile depths, drilling sequences, concrete specifications, and quality records are produced to this standard on every basement project.

AS 3600-2018 — Concrete Structures

All concrete placed by ASAP Piling — capping beams, pile shafts, and pile cores — meets the specification and exposure classification requirements of AS 3600-2018.

AS 4100-2020 — Steel Structures

Sheet pile wall design and permanent steel casing comply with AS 4100-2020. Steel sections comply with AS 3678. Structural steel certification is provided on request.

AS 4678-2002 — Earth-Retaining Structures

Basement retention wall design and construction comply with AS 4678-2002. Temporary propping and anchoring systems are specified by the structural engineer and installed in accordance with the approved design.

Basement Retention System Specifications

Contiguous Pile Diameters360mm, 450mm, 500mm, 600mm, 750mm, 900mm
Pile Spacing75mm to 150mm clear between pile surfaces — to engineer specification
Retention Depth3 to 20+ metres, to engineer specification
Sheet PilingVibratory and press-in (silent) installation — steel sections to AS 3678 / AS 4100-2020
Capping BeamsReinforced concrete to AS 3600-2018 — all dimensions and reinforcement to engineer's drawing
Internal PilingBored piers or CFA piles within the retained perimeter to AS 2159-2009
Concrete Grade25MPa to 40MPa to engineer's exposure classification — AS 3600-2018
Access Capability~900mm access widths — 600mm piles on the boundary fence line

Frequently Asked Questions — Basement Construction

Can ASAP Piling manage the entire below-ground stage of my project?

Yes. ASAP Piling installs the contiguous pile wall, builds the capping beam, and excavates the basement void — all under one contract. This is the most efficient and lowest-risk approach for Melbourne basement construction. Call Nick on 0499 888 799 to discuss your project.

What is the typical sequence for Melbourne basement construction?

The pile wall goes in first, then the capping beam is cast, then excavation proceeds inside the wall in stages as the engineer specifies. The basement floor slab is then poured by the builder. ASAP Piling handles everything up to the point where the basement is clean and ready for the slab contractor.

How long does a residential basement take to build?

Timeline depends on wall length, depth, and ground conditions. A typical single-level residential basement is a 2 to 4 week programme from ASAP Piling's mobilisation to excavation completion. ASAP Piling provides a programme estimate with every quote.

BASEMENT CONTRACTORS MELBOURNE — SINCE 2001

×

Welcome to ASAP PILING

  • Welcome to ASAP PILING! I'm your personal chatbot. To get started, please select one of the following questions:
  • Who we are?
  • What are our services?
  • What is CFA piling?
  • How does CFA piling differ from conventional bored piling?
  • How deep can CFA piles be installed?
  • What size CFA piles does ASAP Piling install?
  • When is a bored pier foundation required?
  • How deep are residential bored piers in Melbourne?
  • Is a soil report required before ASAP Piling can quote?
  • What is the difference between bored piers and screw piles?
  • Can ASAP Piling access very tight residential sites?
  • Can ASAP Piling drill through basalt rock?
  • Does rock drilling cost more than standard bored pier installation?
  • What is a contiguous pile wall?
  • Does a contiguous pile wall need a capping beam?
  • What is a capping beam?
  • What is sheet piling?
  • Can sheet piling be used as a permanent basement wall?
  • What piling machines does ASAP Piling offer for hire?
  • What is the difference between wet hire and dry hire?
  • What geographic area does machine hire cover?
  • What are permanent cased piles?
  • Does ASAP Piling install screw piles?
  • Can I get a piling quote without a soil report?