Bored piers and screw piles are both deep foundation systems used in Melbourne construction, but they are designed for very different applications. Bored piers are drilled and filled with reinforced concrete — suited to the heavy structural loads of homes, townhouses, and commercial buildings on Melbourne's reactive clay soils. Screw piles use helical steel sections screwed into the ground without concrete — suited to lighter structures. Your structural engineer's footing design specifies which one your project needs.

ASAP Piling installs bored pier foundations. We do not install screw piles. This article gives you an accurate, straightforward comparison so you understand why your engineer has recommended what they have — or to help you ask the right questions at the planning stage.

What Are Bored Piers?

Bored piers are reinforced concrete foundation elements installed by drilling a hole to the required depth, lowering a steel reinforcement cage, and filling the hole with concrete. The pile carries the building's weight from the footing system down through soft or reactive surface soil to stable ground below.

In Melbourne, bored piers are the standard deep foundation for:

  • New homes and townhouses on reactive clay sites
  • Multi-unit residential developments
  • Commercial and industrial buildings
  • Basement retention walls

What Are Screw Piles?

Screw piles — also called helical piles — are steel pipe sections with helical steel plates welded around the shaft. They are installed by rotating the pile into the ground using a hydraulic torque head on an excavator. No drilling, no concrete — the steel section is the structural element.

Screw piles are appropriate for:

  • Residential decks, pergolas, and verandahs
  • Temporary or relocatable buildings
  • Lightweight steel-framed structures
  • Solar panel foundations
  • Situations where a concrete truck cannot reach the site

The Key Differences

Factor Bored Piers Screw Piles
Load Capacity High — suited to all residential and commercial building loads Lower — suited to light structures only
Depth 3 to 20+ metres — can reach deep stable ground Typically 2 to 8 metres
Soil Suitability All soil types including reactive clay, soft clay, and rock Best in soft to medium soils — not suitable for hard rock or very stiff clay
Concrete Reinforced concrete pile — durable and engineered No concrete — steel only
Melbourne Clay Standard solution for reactive clay sites across Melbourne Rarely specified by engineers for principal structures in Melbourne clay
ASAP Piling Yes — bored piers since 2001 No — ASAP Piling does not install screw piles

Who Decides — You or Your Engineer?

Your structural engineer decides. The engineer reviews the soil investigation, the building's loads, and the site conditions, then specifies the pile type, diameter, depth, and reinforcement. You do not choose between bored piers and screw piles — the engineer's footing design makes that call.

If your site has reactive clay soil — common across Melbourne's south-eastern, eastern, and bayside suburbs — your engineer will almost certainly specify bored piers for any home or commercial structure. If you don't yet have a soil report or structural engineer, call Nick on 0499 888 799. ASAP Piling can advise on what's typical for your suburb and refer you to geotechnical engineers.

Frequently Asked Questions

No. ASAP Piling installs bored pier foundations only — bored piers, CFA piles, contiguous piling, sheet piling, and permanent cased piles. For screw pile installation, engage a specialist screw pile contractor. Your structural engineer's footing drawings will specify which system is required for your project.

No. The footing type is determined by the structural engineer's design and must be constructed as specified. Substituting a different pile type without the engineer's approval would be a departure from the approved plans and could void the building permit. If you believe screw piles may be appropriate for your project, discuss this with your structural engineer before any work commences.

Lead times vary depending on current workload and site readiness. ASAP Piling typically provides a programme time with each quote. To minimise delays, have your engineer's footing drawings, soil report, and site access confirmation ready when you contact us. Call Nick on 0499 888 799 to discuss availability.

Ready to discuss your bored pier project?

Call Nick on 0499 888 799 or email info@asappiling.com.au. Have your soil report and engineer's drawings ready for a detailed quote.

Get a Quote

Related Articles

CFA Piling CFA Piling Melbourne: The Complete Guide

How CFA piling works, when it suits Melbourne projects, soil suitability, and production rates.

Read More
Pricing How Much Does Piling Cost in Melbourne? 2026 Guide

What drives piling costs in Melbourne — bored piers, CFA piles, rock drilling, and contiguous piling explained.

Read More