To give a firm, comparable piling quote in Melbourne, a contractor needs five things: a geotechnical report with borehole logs, the engineer's piling plan with positions, diameters, depths and loads, measured site access details, information on overhead and underground services, and program expectations. ASAP Piling explains what each piece does to your price, so you can request quotes from several contractors and actually compare them.
We get two kinds of enquiry.
The first arrives with a soil report, an engineer's footing plan and a few photos of the site access. That one gets a firm, detailed quote in two to three business days, and the number on it is the number you pay.
The second says "how much for piling on a townhouse in Preston?" That one gets a range so wide it is useless to everybody, because there is no honest way to price piling without knowing what is under the site.
This article explains what we need, why we need it, and what each missing piece does to your number. If you are about to request quotes from several contractors, reading this first will get you comparable prices instead of four numbers you cannot line up against each other.
The Short Version
To price piling properly, a contractor needs:
- A geotechnical report with borehole logs
- The engineer's footing or piling plan with pile positions, diameters, depths and loads
- Site access details — measurements and photos, not descriptions
- Site services information — overhead and underground
- Program expectations — when you need it and any hours restrictions
1. The Geotechnical Report
This is the one that matters most, and the one most often missing.
A geotechnical investigation puts boreholes down on your site and logs what comes out. The report tells us and your engineer:
- The soil profile with depth — what material sits at each level and how strong it is
- Rock level, if any — and what kind of rock, which determines whether we bring a rock-drilling setup
- Groundwater level — which affects method, casing requirements and whether the hole will stand open
- Site classification under AS 2870 for residential work — A, S, M, H1, H2, E or P, based on how reactive the clay is to moisture change
- Recommended founding levels and bearing capacities — the numbers your engineer designs against
Why the report affects the price: AS 2159, the Australian Standard governing piling design and installation, sets geotechnical strength reduction factors according to the level of risk associated with the job. Thorough site investigation, an experienced installer and proper testing all reduce that assessed risk. Lower risk means a higher design capacity per pile.
If you do not have a geotechnical report, we can quote provisionally against an assumed profile with the assumption stated explicitly, so you know exactly which condition triggers a variation. What we will not do is give you a firm price on a guess and then discover basalt at three metres.
2. The Engineer's Piling Plan
Piling is engineered work. The design comes from your structural or geotechnical engineer, and we install and verify to it.
What we need from the drawing set:
- Pile positions — a marked-up plan, not a count
- Pile diameters — 450 mm and 600 mm price very differently
- Design depths or founding criteria — "to rock" and "12 metres" are different instructions
- Loads, including any tension — uplift changes reinforcement and embedment, and it is common on reactive clay sites
- Reinforcement details — cage lengths, bar sizes, cover
- Concrete specification — strength grade and any durability requirements
- Levels — existing surface levels and the cut-off level for each pile
The most common gap: cut-off level. If piles are installed from existing ground and cut down to a level three metres below, that is three metres of drilling and concrete per pile that has to be priced and then demolished. It is a significant cost and it is frequently missing from the information supplied.
3. Site Access — Measured, Not Described
"Reasonable access" means something different to everybody. Send measurements.
What to measure
- The narrowest point anywhere along the route from the street to the furthest pile position — gate posts, meter boxes, downpipes, air conditioning units, the corner where the path turns
- Overhead clearance — power lines, eaves, verandah roofs, branches, pergolas. Drill masts sit well above the machine's travel height
- Level changes — steps, retaining walls, slopes, and whether a ramp is needed
- The crossover — width, condition, and whether council requires an asset protection permit for heavy plant crossing the footpath
What to photograph
The street frontage, the crossover, the full access route in sequence, each pile area, and any structure within a few metres of a pile position. Put a tape measure in the frame at the tight points.
Access is the single largest driver of cost variation on constrained Melbourne sites. A rig that fits the site does the job at a normal rate. A rig that does not means smaller plant, more piles, longer install times or hand methods.
4. Services — Overhead and Underground
Before drilling, we need to know what is in the ground. A Dial Before You Dig enquiry is the starting point, but plans show mains, not the private services running from the meter to the house. Those are found with a locator or by hand.
Overhead power sets minimum clearances for plant. On some sites it dictates the machine, and on a few it means arranging an isolation with the distributor — which is a lead-time item, not a site-day item.
5. Program and Site Conditions
- When do you want us? Piling usually sits on the critical path, and the following trades are booked against it.
- Any hours restrictions? Some councils and some sites restrict working hours beyond the standard construction windows. That directly multiplies the number of days.
- Where does spoil go? Bored piling generates significant spoil. If it is stockpiling on site, we need somewhere for it. If it is carting away, that is a separate cost that needs to be priced — and it is worth confirming who is pricing it.
- Concrete access. Can a truck get close, or is a pump needed? Pump setup, line length and standing time are all real costs.
What Separates a Quote You Can Rely On
When comparing prices, check whether each one states:
- The assumed ground conditions and what happens if they differ
- Whether rock drilling is included or excluded, and at what rate if encountered
- Whether spoil removal is in or out
- Whether concrete supply is in or out
- Mobilisation — how many visits are priced
- Cut-off and pile trimming — included or a separate item
- Set-out — who is responsible
Call Nick on 0499 888 799 — have your soil report and footing plan ready and we will come back with a detailed quote.
Frequently Asked Questions
Related Articles
Where Melbourne's basalt is found and what equipment it takes to drill through it.
Read MoreIndicative rates for all pile types and what drives the price up or down.
Read More